|
Day EIGHTEEN This is the day that the west wall begins! Let it rise! This will be done around a trip to downtown to pour beer for the Masons as a fundraiser. I bought a phone terminal for 4 extensions that I think I will install before the electric box gets roughed out. Plans for today:
notes: the door rough in is 32 1/2" by 82" for a 30x80 door. Also, the cinder block wall or the stairwell wall is off kilter as the measurements are 201 1/2" for the top plate length, and 202" for the bottom plate length. NO PICTURES! Previous Day || Home || Next Day |
|
Contact Me with questions or comments about this web site or for a quote. Design by Chuck Home • Basement Remodel • Contact Us • Sitemap • Put-in-Bay Resort • Put-in-Bay Island Guide |